How Much Material for a 10x10 Shed Pad? (2026 Full List)
How much material for a 10×10 shed pad? The 100-sq-ft pad at 4 in deep needs about 56 bags of 80-lb concrete (or ~1.5 cu yd delivered) over a 4-in gravel base of ~1.4 cu yd, plus 2×4 forms.
Anatomy of a 10×10 shed pad
A 10×10 shed pad is 100 sq ft, and the standard build is a 4-in crushed-stone base under a 4-in slab. Each layer takes:
- Crushed-stone base — 4 in ≈ 33.3 cu ft; order 1.4–1.5 cu yd.
- Concrete slab — 4 in ≈ 33.3 cu ft; order 1.5 cu yd ready-mix or 56 × 80-lb bags.
- Forms — 2×4s around all four sides (40 linear ft) plus stakes.
Concrete: 33.3 cu ft (1.5 cu yd, or 56 bags)
Volume is area × depth: 100 sq ft × (4 ÷ 12) = 33.3 cu ft, and 33.3 ÷ 27 ≈ 1.23 cu yd. Order 1.5 cu yd of ready-mix to cover leveling waste and truck rounding; in bags (80-lb ≈ 0.60 cu ft):
| Slab depth | Volume (100 sq ft) | Cubic yards | 80-lb bags |
|---|---|---|---|
| 4 in | 33.3 cu ft | 1.23 | 56 |
| 5 in | 41.7 cu ft | 1.54 | 70 |
| 6 in | 50.0 cu ft | 1.85 | 84 |
4 in is the standard shed-pad thickness; the bag route means 56 × 80-lb bags ≈ 4,480 lb — practical only for small pads or repairs. Double-check any slab in the concrete calculator.
Calculate concrete for your pad →
Gravel base: order 1.4–1.5 cu yd
The base is the same footprint at the same depth: ≈ 33.3 cu ft = 1.23 cu yd once compacted. Crushed stone is sold loose and settles 10–15%, so 1.23 × 1.10–1.15 ≈ 1.35–1.42 — round the order up to 1.4–1.5 cu yd. Use angular 3/4-in crushed stone; the gravel calculator converts a weight quote to yards.
Calculate gravel for your base →
Forms: five 8-ft 2×4s, eight stakes, and nails
Forms run all four sides: 10 × 4 = 40 linear ft, so five 8-ft 2×4s (pressure-treated lasts longest in ground contact) cover the perimeter exactly. Drive about 8 stakes — every 5 ft plus corners — against the outside of the boards, set them edge-up at slab depth, and pin each stake with 2-in galvanized nails or deck screws.
Ready-mix truck or bagged concrete?
For a 10×10 pad, ready-mix wins: one 1.5 cu yd delivery pours the whole slab in a morning; bags mean batching 4,480 lb over a full day, with cold joints if the pour stalls.
Pick bags only when a truck can't reach the site or the pour is split into sections; rent a mixer and work wet edge to wet edge so the slab cures as one piece.
Shed pad tips that save you a re-pour
- Compact the subgrade first — loose dirt settles and cracks the slab. Skim the sod, level the soil, and tamp it before the gravel goes in.
- Slope for drainage — pitch it about 1/4 in per ft away from the shed door so water never ponds under the floor.
- Compact the stone before pouring — the base must be a full 4 in deep after compaction; that's why you ordered the extra 10–15%.
- Moist-cure the slab — keep it damp or covered 5–7 days so it cures strong instead of cracking.
Full materials list for a 10×10 shed pad
| Item | Amount needed | Order this | Verify |
|---|---|---|---|
| 3/4-in crushed stone | 33.3 cu ft (≈1.23 cu yd) | 1.4–1.5 cu yd | gravel calculator |
| Concrete | 33.3 cu ft (≈1.23 cu yd) | 1.5 cu yd ready-mix, or 56 × 80-lb bags | concrete calculator |
| 2×4 form boards | 40 linear ft | 5 × 8-ft boards | — |
| Form stakes | about 8 | 8–10 stakes | — |
| Nails or deck screws | about 24 | 1-lb box of 2-in galvanized | — |
Different footprint, or pouring without a gravel base? See how many bags of concrete per square foot and how much concrete for a 10×10 slab.
FAQ
How many cubic yards of concrete do I need for a 10×10 shed pad?
About 1.5 cu yd delivered. A 4-in slab on 100 sq ft is 33.3 cu ft ≈ 1.23 cu yd, and you order 1.5 cu yd to cover leveling waste and ready-mix rounding. In bags: 33.3 ÷ 0.60 ≈ 56 bags of 80-lb mix.
How much gravel do I need for a 10×10 shed pad base?
About 1.4–1.5 cu yd. A 4-in base on 100 sq ft is 33.3 cu ft ≈ 1.23 cu yd once compacted; crushed stone is sold loose and settles about 10–15%, so order 1.4–1.5 cu yd.
Is hand-mixing concrete realistic for a 10×10 pad?
Not really. 56 bags of 80-lb mix is about 4,480 lb of dry material — a long, heavy day even with a rented mixer. Order 1.5 cu yd of ready-mix for the pour and keep bags for small pads or tight-access sites.
Need a different size?
Our free calculators give you the exact answer in seconds.